Home/Methodology/DG2 Capital Structuring
Gate 02 of 06
Decision Gate · DG2 · Capital Structuring

Debt, tax equity, and sponsor stack designed as a single optimization problem.

The capital stack decides the IRR. Everything else is execution. Most sponsors structure stacks one provider at a time and end up with a stack no individual provider designed, optimized for the path of least resistance rather than the lowest blended cost. DG2 is where that gets fixed, before financial close locks the structure for the life of the project.

Gate at a glance

Key decisions
  • What is the optimal blended cost of capital across all sources?
  • Tax equity flip, transferability, direct pay, or sale-leaseback?
  • Which bonus credits qualify, and at what substantiation depth?
  • How does PWA exposure constrain the structure?
Bankable artifacts
  • Capital stack model with blended cost sensitivity
  • Senior debt sizing + DSCR memo
  • Monetization comparison (after-tax NPV)
  • Bonus credit qualification packages
  • PWA compliance plan
  • Common information memorandum
  • Term sheets in flight, then definitive docs
Common failure modes
  • Stack assembled in series rather than optimized
  • Default to incumbent monetization path without modeling alternatives
  • Aggressive basis without contemporaneous substantiation
  • Lender-led structure that benefits the bank more than the project
Kill bar
  • Blended cost of capital exceeds project IRR threshold
  • No monetization path delivers acceptable after-tax NPV
  • PWA exposure unresolvable or uninsurable
  • Tax equity universe declines at deal size or sponsor profile

Sub-gates within DG2

DG2.A
Stack design
Capital stack frozen at optimized blended cost of capital. Sources sized as a single problem.
DG2.B
Term sheets
Term sheets in flight across all providers on a common information memorandum.
DG2.C
Definitive documentation
Credit agreement, intercreditor, security package marked up and converging.
DG2.D
Financial close
All CPs cleared, simultaneous funding, post-closing covenant tracker live.